The business has grown substantially in nearly 10 years of trading and now employs a Project Manager, four office-based staff and over thirty subcontractors working with us, many of whom live in the Sedgemoor area.

Working throughout the South West, encompassing Bristol and Weston-super-Mare, Exeter and Taunton. We have undertaken numerous carpentry projects in the Sedgemoor area over the past 12 months including Station Road in Brent Knoll, All Saints Terrace in Bridgwater, Northgate Yard in Bridgwater, Durleigh View in Bridgwater, and a shop installation in Bridgwater for a national company. We are an award winning company over the years.

Carpentry contractors that provide all aspects of carpentry services for main contractors and developers, providing the best quality in the South West UK

We use local suppliers including AG&R, Electro South West, The Fascia Place, Somerset Joinery Solutions Ltd and Locks, Doors and Window Fittings for fixtures and fittings, as well as the local branch of Bradfords Building Supplies. We use Fairway Office Supplies for paper supplies, Witchell Auto Services to maintain and service our works vehicles and Maxwells Chartered Accountants oversee the Company accounts.

Our attention to quality and health and safety is reinforced with memberships of TRADA, SMAS and The Building Safety Group. A detailed annual application has to be submitted to SMAS annually, proving health and safety standards along with evidence to show other requirements such as Environmental awareness are met. The Building Safety Group are our health & safety advisors, and they make regular site visits to ensure high standards are met. Regular toolbox talks, such as dust awareness and manual handling, are given to subcontractors working on site and all subcontractors must hold a valid and current CSCS card to demonstrate to they are qualified to undertake the allocated tasks. All staff complete a health declaration on an annual basis.

We are committed to always maintaining the highest professional environmental standards within our team. We aim to integrate sustainable methods into our everyday activities where possible by ensuring we select sustainable materials, keep wastage to a minimum and to utilise existing materials. We have a wealth of experience and feel compassionate about driving innovation within the sector. We only ever use PEFC or FSC certified products ensuring we promote timber as a renewable and sustainable material. Paper for the office is climate neutral paper and printer toners are returned to our supplier for recycling. We also re-cycle all paper, cardboard and cans that get used in the office.

We were able to adapt quickly and put the best working practises in place during the pandemic. Clerical staff worked from home and site procedures were reviewed regularly and updated, enabling work to continue as safely as possible.

Our trade operatives are our most valued asset, they are highly skilled, dependable, and professional. Having a reliable and dependable workforce gives us confidence in what we can achieve, and this is proven by having lots of returning customers.

Project: All Saints Terrace, Bridgwater

Customer: EG Carter & Co Ltd

We successfully collaborated with EG Carter & Co Ltd on this development of twenty affordable homes to rent in Bridgwater for Magna Housing, comprising of eight town houses and six one-bedroom flats and six two-bedroom flats with refuse and cycle store facilities. The development is close to Bridgwater Train Station and within walking distance
of the town centre. All subcontractors who worked on this project live in the Sedgemoor area.

On this development, carpentry works included:

  • First fix – installation of stairs, window boards, pattressing and studwork
  • Second fix – Door linings, internal doors, ironmongery, architraves, and skirtings
  • Kitchen installations
  • Fitting cladding to external dormer windows

Project: Durleigh View, Bridgwater

Customer: Jones Building Group

We are pleased to be working with returning customer Jones Building Group on this exclusive collection of nine, three-bedroom detached chalet style homes in a much sought-after area of Bridgwater. Each home is fitted with a sustainably sourced UK British manufacturer Howden kitchen. All subcontractors who are working on this project live in the Sedgemoor area.

On this development, carpentry works include:

  • First fix – Installation of stairs, window boards, pattressing and studwork
  • Second fix – Door linings, internal doors, ironmongery, architraves and skirtings
  • Kitchen installations
  • Fitting external cladding

Project: Kingsdown, Bridgwater

Customer: Vistry Partnerships West

We have recently started working with Vistry Partnerships West on eighty affordable homes on the Kingsdown development in Bridgwater. These energy efficient homes will be built with ASHP, solar panels and electric car charging points. We really look forward to seeing this project progress.
On this development, carpentry works will include:

  • First fix – Installation of stairs, window boards, pattressing and studwork
  • Second fix – Door linings, internal doors, ironmongery, architraves and skirtings
  • Kitchen installations
  • Laying acoustic flooring
  • Fitting external cladding